Product main image

Change Order T‑Shirt — Industrial Blueprint Graphic Tee ("Change Order: Adapt. Revise. Deliver.")

$27.99
Comfort Colors® Colors: Pepper
Clothing sizes: S
Quantity
30 days return policy.
  • Visa card accepted
  • Mastercard accepted
  • American Express accepted
  • Diners Club accepted
  • Apple Pay accepted
  • Google Pay accepted
About the product
This garment-dyed tee feels lived-in from the first wear. The heavyweight cotton and relaxed cut hang easy across the shoulders, while the faded, vintage-ready color gives the bold “CHANGE ORDER” blueprint graphic a worn, workshop-ready attitude. It moves with you on site or on the weekend — comfortable during long days, breathable enough for layered looks, and softening further with every wash. Whether you’re sketching revisions, swapping notes by the trailer, or winding down after a long build, this shirt reads like a trusted crew piece that quietly signals craft, process, and hard work.

Product features
- 100% ring-spun US cotton — heavyweight (6.1 oz) for durability and comfort
- Garment-dyed finish for soft, lived-in color and texture
- Relaxed fit with pre-shrunk fabric and sizes S–4XL (select partners)
- Tubular knit (no side seams) with double-needle stitched hems for longevity
- Sewn-in label and available in 58 color options

Care instructions
- Machine wash: cold (max 30C or 90F)
- Do not bleach
- Tumble dry: low heat
- Iron, steam or dry: low heat
- Do not dryclean
Garment-dyed fabric

Garment-dyed fabric

The garment is dyed after it's been constructed, giving it a soft color and texture

100% Cotton

100% Cotton

100% ring-spun US cotton for long-lasting comfort.

S to 4XL

S to 4XL

Available in multiple sizes from S to 4XL (select partners) so your customers can find the perfect fit. Consult with our Comfort Colors 1717 size chart for all available sizes.

Double-needle stitching on all seams

Double-needle stitching on all seams

The garment is sewn around the finished edges with double stitching, making it long-lasting

Without side seams

Without side seams

The Comfort Colors 1717 tee is knit in one piece using tubular knit, which makes the garment more attractive.

Country of origin

Country of origin

Made in Honduras

WashingBleachingDryingIroningDrycleaning

Machine wash: cold (max 30C or 90F); Do not bleach; Tumble dry: low heat; Iron, steam or dry: low heat; Do not dryclean.

Accurate shipping options will be available in checkout after entering your full address.

Any goods purchased can only be returned in accordance with the Terms and Conditions and Returns Policy.

We want to make sure that you are satisfied with your order and we are committed to making things right in case of any issues. We will provide a solution in cases of any defects if you contact us within 30 days of receiving your order.

See terms and conditions